无套内谢少妇毛片a片免费,免费又黄又爽又色的视频,精品久久久久久综合日本,粗长灼热快速捣出白沫h

歡迎進(jìn)入山東恒能環(huán)保能源設(shè)備有限公司

熱線電話

0531-69953988

分類導(dǎo)航
產(chǎn)品展示
聯(lián)系我們
山東恒能環(huán)保能源設(shè)備有限公司

聯(lián)系電話:18678860671

服務(wù)熱線:0531-69953988

聯(lián)系地址:中國(山東)自由貿(mào)易試驗區(qū)濟(jì)南片區(qū)孫村街道經(jīng)十東路33688號章錦綜合保稅區(qū)聯(lián)東U谷科創(chuàng)中心5號樓 101

沼氣凈化脫硫裝置的運行維護(hù)!

沼氣凈化裝置的運行維護(hù)應(yīng)符合下列規(guī)定:

The operation and maintenance of biogas purification device shall meet the following requirements:
1、應(yīng)定期排出脫水、脫硫裝置中的領(lǐng)凝水。當(dāng)室外溫度接近0℃時,應(yīng)每天排除冷凝水,排水時應(yīng)防止沼氣泄漏。
1. The condensate water in dehydration and desulfurization unit shall be discharged regularly. When the outdoor temperature is close to 0 ℃, the condensate water should be drained every day, and the leakage of biogas should be prevented during drainage.
2、生物脫硫啟動運行正常后,應(yīng)定期檢查脫硫前后硫化氫濃度變化,硫化氫去除率應(yīng)滿足后端工藝要求。當(dāng)發(fā)現(xiàn)脫硫效率明顯下降時,應(yīng)及時補(bǔ)充循環(huán)營養(yǎng)液。塔內(nèi)填料應(yīng)6-12個月清洗1次。
2. After the start-up and operation of biological desulfurization are normal, the change of hydrogen sulfide concentration before and after desulfurization should be checked regularly, and the hydrogen sulfide removal rate should meet the requirements of back-end process. When it is found that the desulfurization efficiency is obviously decreased, the circulating nutrient solution should be supplemented in time. The packing in the tower should be cleaned once every 6-12 months.
3、應(yīng)定期檢查干法脫硫塔前后硫化氫濃度、沼氣壓力變化,當(dāng)達(dá)不到設(shè)計要求時應(yīng)更換脫硫劑或進(jìn)行脫硫再生。
3. The change of hydrogen sulfide concentration and biogas pressure before and after the dry desulfurization tower should be checked regularly. When the design requirements are not met, the desulfurizer should be replaced or the desulfurization regeneration should be carried out.
                       沼氣脫硫
4、干法脫硫塔再生應(yīng)符合下列規(guī)定:
4. Regeneration of dry desulfurization tower shall meet the following requirements:
1).當(dāng)采用塔內(nèi)脫硫劑再生時,應(yīng)關(guān)閉沼氣進(jìn)出口閥,打開旁通管道和放散管路閥門。
1) When the desulfurizer in the tower is used for regeneration, the inlet and outlet valves of biogas should be closed, and the valves of bypass pipeline and discharge pipeline should be opened.
2).當(dāng)采用在線脫硫劑再生時,應(yīng)根據(jù)沼氣中硫化氫含量確定空氣摻混量及空氣流速,塔內(nèi)溫度應(yīng)低于70℃,脫硫塔出口處沼氣中氧含量應(yīng)小于1%;
2) When online desulfurizer regeneration is used, the air mixing amount and air flow rate should be determined according to the content of hydrogen sulfide in biogas. The temperature in the tower should be lower than 70 ℃, and the oxygen content in biogas at the outlet of desulfurization tower should be less than 1%;
3).脫硫劑進(jìn)行2次~3次再生后應(yīng)及時更換,更換脫硫劑時操作人員應(yīng)戴防毒面具,室內(nèi)應(yīng)進(jìn)行通風(fēng);
3) The desulfurizer should be replaced in time after 2 ~ 3 times of regeneration. When replacing the desulfurizer, the operators should wear gas masks, and the room should be ventilated;
4).廢脫硫劑的處置應(yīng)符合環(huán)境保護(hù)的要求。
4) The disposal of waste desulfurizer should meet the requirements of environmental protection.

相關(guān)產(chǎn)品 我們的存在,是為了更好的服務(wù)于沼氣等可燃?xì)怏w凈化及利用行業(yè)
国产精品久久久一区二区三区| 日韩精品无码区免费专区| 精品熟女少妇av免费观看| 艳妇500篇短篇h系列| 亚洲av无码潮喷在线观看| 老司机午夜精品99久久免费| 小处雏一区二区三区精品视频| 在教室伦流澡到高潮hgl视频| 又大又黄又粗又爽的免费视频| 日本xxxx色视频在线播放| 雯雯被四个男人拖进工地| 帅气体育生gary网站mv软件| 亚洲午夜久久久久妓女影院| 少妇人妻无码专区视频免费| 国产免费av片在线无码免费看| 99精品国产丝袜在线拍国语| 国产午夜福利视频在线观看| 免费十大禁用软件安装下载| 色综合久久久久综合体桃花网| 熟妇少妇任你躁在线无码| 变态捡到女婴h养成调教| 久久精品亚洲av无码乱码三区| 新版天堂资源中文8在线| 人妻夜夜爽天天爽爽一区| 浴室人妻的情欲hd三级国产| 办公室撅着屁股被校长玩弄| 亚洲av之男人的天堂| 日产一线二线三线网站| 国产精品av在线| 被黑人扒开双腿猛进夏科骨科| 人妻办公室出轨上司hd院线| 97久久人人超碰国产精品| 我身上两个奶被男人揉搓| 顶级少妇做爰视频在线观看| 少妇又色又紧又爽又刺激视频| √天堂资源地址在线官网| 精品无码久久久久久久久久| 在线视频国产欧美另类| 日日摸天天碰中文字幕你懂的| 国产v亚洲v天堂无码久久久| 少妇伦子伦精品无码styles|